Conceiving construction plans
To help develop this article, click 'Edit this article'.
Contents |
[edit] Introduction
Construction planning is the process of formulating activities required to undertake a construction project. This includes analysing the implications of each activity and selecting from the alternatives the appropriate method to accomplish the project goals.
Construction plans are used to prepare budgets and schedule works and to determine which participants are necessary in the project team.
[edit] Purpose of planning
Construction planning is crucial for successful completion of projects within the set time, quality and cost. It is an integral part of project execution that involves all stakeholders to ensure delivery and compliance.
[edit] Key considerations in construction planning
There are technical issues that must be taken care of in the preparation of construction plans. These aspects form the basic parts of the plan and can also be used as guidelines to analyse the effectiveness of the final plan.
First and foremost is the choice of construction methods and technologies to be used. This is a high priority since it has an impact on material choices. It also allows planners to check and compare technologies, classes of work required, types of systems for the structure and environmental implications.
It is also necessary to keep in mind that preparation of a construction plan is a backward reasoning process that seeks to define tasks, set time and assign resources to reach a predetermined outcome.
Prior to this it is important to determine what the emphasis of the plan should be. Is it directed towards cost control , schedule control (or quality)? With cost control, it is better to evaluate direct and indirect costs (such as overhead costs, financing costs, activity cost and so on). With schedule control as the focus, the main criteria should be on the precedence of activities, efficiency, resource availability and utilisation and integration of schedule and budget.
[edit] Construction method
The selection of different technological and methodological alternatives for the construction of the designed structure starts in the preliminary design stages. Often at this stage, alternatives are devised by architects and are hypothetical and abstract. They form the basis for the future detailed development of the construction method to be used, which may involve engineers, contractors, suppliers and specialists.
From a number of developed alternatives, the analysis is made weighing the cost, time and quality for each method. Depending on the availability of equipment, effects of each method and the skills available for each method, the most feasible method is chosen and a detailed plan is prepared.
[edit] Setting up project activities
It is important to take into consideration the technology and methods selected for the project. Individual activities should be scheduled in accordance with the defined precedent of works, since this will help to frame efficient organisation of construction tasks and allocate resources dependent on often repeated activities.
The defined activities should be developed in detail for all the tasks, including time and resources (equipment and labour), planning.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February